Presidential Palace - new capital (Mansoura 1)
Supply and installation of GE busway, GE and ASCO automatic transfer switches, and Piller UPS.
Presidential Palace
Scope of Work & Execution
Presidential Palace (New Capital) - Supply, installation, testing and commissioning of an integrated power-continuity solution comprising GE busway distribution, GE and ASCO automatic transfer switches, and Piller UPS and static transfer switch systems, ensuring uninterrupted supply to critical loads.
Project Overview
- Client Presidential Palace
- Category Government & Defense
- Main Contractor HAC / Concord / Tiba / Red Sea
- Consultant Shaker Consultancy Group (Dr. Shaker)
- Start Date 2017
- Completion Date 2023
- Location Cairo, Egypt
Need a Similar Solution?
Consult our engineering team for technical evaluations or tender inquiries.
Inquire About This Project1000+
Engineered for Uptime, Built for Scale
From custom switchgear assembly to turnkey LV/MV electrical contracting, we deliver robust infrastructure solutions backed by 24/7 SLA maintenance.
Empowering Industry Leaders Through Strategic Collaboration
We build enduring partnerships grounded in trust, delivering robust, high-performance solutions engineered to power growth and operational excellence.
'Built on Trust. Driven by Engineering Excellence.'















