Ras Shukeir Power House Upgrading and Power Management System
Supply and installation of GE MV switchgear, MV busway, GE Multilin relays and PMS, including design studies.
GUPCO (Gulf of Suez Petroleum)
Scope of Work & Execution
The scope covers the upgrade of the power house, including design and studies (load flow, short-circuit, stability, selectivity, coordination and earthing) and the supply and installation of GE medium-voltage switchgear (MVSG), MV busway, and GE Multilin protection relays, together with ANSI-standard instrument meters and indicators. All power house equipment are connected to the NUXES-type Power Management System (PMS) for monitoring and control. The scope also includes the fabrication and installation of a prefabricated building to the PMS system, Installation, Testing and Start-Up of MV Busway System
Project Overview
- Client GUPCO (Gulf of Suez Petroleum)
- Category Oil & Gas
- Main Contractor East Gas Company (EGC)
- Consultant PGESCo
- Start Date 2018
- Completion Date 2026
- Location Ras Shukeir, Egypt
Need a Similar Solution?
Consult our engineering team for technical evaluations or tender inquiries.
Inquire About This Project1000+
Engineered for Uptime, Built for Scale
From custom switchgear assembly to turnkey LV/MV electrical contracting, we deliver robust infrastructure solutions backed by 24/7 SLA maintenance.
Empowering Industry Leaders Through Strategic Collaboration
We build enduring partnerships grounded in trust, delivering robust, high-performance solutions engineered to power growth and operational excellence.
'Built on Trust. Driven by Engineering Excellence.'















